Schedule 1
(Relating to Sub-rule (1) and (2) of Rule 3)
Application Form
M/S……………………………………Office
……………………………………
This is to request with attachments of drawings and documents for your
approval/pre-design concurrence to construct the building of
……………………..square in the following plot of land.
Building Construction Site:-
…………………District …………………..Municipality/VDC/Ward
No……….Map No………., Plot No…………..
Name of Applicant:-
Address:-
Phone no.:-
Signature of Applicant:-
Date:-
Please mark the Category of the building used for designs as per the
requirements of Section 8 of the Building Act, 2055 (1998) with √ sign.
(a) “A” Category
(b) “B” Category
(c) “C” Category
Documents Attached:
1. Architectural Drawings:-
S. No. | Drawings | No. of Sheets |
1. | Floor Plans | |
2. | Elevations | |
3. | Two sections- Longitudinal Section and Cross Section ( One of the sections should be through staircase) | |
4. | Site Plan | |
5. | Elevation of Doors and Windows showing their openings and sizes | |
6. | Staircase Details | |
7. | Ramp Details | |
8. | Others (if any) |
2. Structural Drawings:-
S. No. | Drawings for frame structure | No. of Sheets |
1. | Column Reinforcement for critical column (indicate position of the column in structure) | |
2. | Critical beam reinforcement (indicate position) | |
3. | Slab Reinforcement |
4. | Staircase reinforcement | |
5. | Trench Plan and toe wall details | |
6. | Critical foundation details (indicate position) | |
7. | Ductile detailing of beam and column joint | |
8. | Others (if any) | |
S. No. | Drawings for Load Bearing Buildings | No. of Sheets |
1. | Architectural plan of each floor showing vertical steel reinforcement at critical sections. | |
2. | Trench plan and foundation details | |
3. | Slab reinforcement | |
4. | Wall cross section | |
5. | Others (if any) |
3. Sanitary Drawings:- For the Categories “A” and “B” only
S. No. | Drawings | No. of Sheets |
1. | Toilet detail plan (each floor) | |
2. | Roof plan | |
3. | Site plan | |
4. | Plans of Underground water tank, Septic tank, Soak pit and Manhole |
5. | Isometric drawing (flow diagram chart) |
6. | Section (toilet with duct detail) |
7. | Drainage detail |
8. | Fire fighting system |
9. | Others (if any) |
4. Electrical Drawings:- For the Categories “A” and “B” only
S. No. | Drawings | No. of Sheets |
1. | Layout | |
2. | Wiring | |
3. | Schematic | |
4. | Others (if any) |
5. Cadastral Map of the Plot:-
6. Letter of Contract with technician/consultant involved in construction of
the building as per the requirements of Sub-section (3) of Sections 10
and 11 of the Act:-
7. Forms of Technical Details:-
(a) Relating to Architectural Design:-
(b) Relating to Structural Design:-
(c) Relating to Sanitary Design, for Category ‘A’ and ‘B’ only:-
(d) Relating to Electrical Design, for Category ‘A’ and ‘B’ only:-
Note:
1. Regarding scales of drawings, all drawings shall be of 1:100 or 1” = 8’, and the detailing shall not be in lesser than 1:50 or 1” = 4’. With regard to Site Plan, the scales shall be 1:100 or 1”=8’ upto a Ropani, and 1:1200 or 1”=16’ for more than a Ropani.
2. Should the construction site be inspected in the process of issuing design concurrence, it shall be got inspected.
3. The Forms A, B, C and D of Technical Detail Form No. 1 shall be filled up in regard to Category “A” and “B”.
4. The Form A of Technical Detail Form No. 1 and Structural Design Requirements of Form No. 2 shall be filled up in regard to Category “C”.
5. Should any confusion arises in regard to implementation of the Schedule 1, the decision of the Committee shall prevail.